MES · Auto-Stop · EEC Zone

Stop before
waste happens.

Corelogic connects to your existing PLC and stops the production line the moment a parameter goes out of range — before any defective part is made. Live in 2 weeks.

฿0
CAPEX required
2w
to go live
30d
free trial
94%
defect reduction

// The Problem

Three reasons factories
keep producing defects.

We built Corelogic to eliminate every one of them.

01

Detected too late

Thousands of defective parts produced before any alert fires. By the time a human inspector catches it, the damage is already done — material wasted, machine time lost, customer complaints incoming.

02

Unknown stop causes

The line stops and nobody knows why. Operators guess. Maintenance guesses. The same cause recurs next shift. Without data, root cause analysis takes days instead of minutes.

03

Operators skip steps

Pre-production checklists exist on paper but go unchecked. Workers follow habit instead of procedure. A single skipped step — wrong label, wrong parameter — scraps an entire lot.

// Features

Built specifically
for IE & Production teams.

Every feature exists because an IE manager asked for it. Nothing more, nothing less.

Core feature

Auto-Stop Engine

Real-time PLC parameter monitoring with configurable thresholds. When any value exceeds your limit, the line stops automatically — before a single defective part is produced.

Digital Checklist

Enforce every pre-production step. The line cannot start until all checklist items are confirmed by the operator. No bypassing, no skipping, full timestamp log.

Master Label Verification

Scan and verify product labels before every run. Prevent wrong-spec labels from entering production and causing lot rejections worth hundreds of thousands of baht.

No-Code Rule Engine

Configure stop logic without writing a single line of code. Adjust thresholds, add conditions, and deploy changes instantly from your browser — no IT involvement needed.

Event Log & Analytics

Every machine event — stop, start, anomaly, override — is logged with full timestamp and actor. Review stop causes, analyze trends, and produce reports for your QA team on demand.

No hardware change

PLC Integration

Native compatibility with Mitsubishi, Siemens, and Omron PLCs. No hardware replacement. No PLC reprogramming. We connect to what you already have.

// How It Works

From PLC to dashboard
in four steps.

Step 1

Connect

Our engineer connects Corelogic to your existing PLC via standard industrial protocols (MC Protocol, S7Comm, FINS). No rewiring, no hardware changes.

Step 2

Configure Rules

Using the no-code rule engine, you define what conditions should trigger a line stop. Temperature limits, pressure thresholds, cycle time deviations — all configurable from the dashboard.

Step 3

Monitor Live

Your dashboard goes live. IE engineers and supervisors see real-time machine status, defect rates, and alerts from any browser — plant floor, office, or mobile.

Step 4

Analyze & Improve

Corelogic logs every event. Over time, you identify which machines, which shifts, which parameters cause the most stops. Continuous improvement becomes data-driven.

// Integrations

Works with your
existing equipment.

Corelogic connects to any PLC via standard industrial protocols. No new hardware. No rewiring.

Mitsubishi
MC Protocol / MELSEC
Siemens
S7Comm / TIA Portal
Omron
FINS / EtherNet/IP
Keyence
Vision System API
Modbus TCP
Universal protocol
+ More on request

// Results

Measurable outcomes.
Every factory.

0%
Average defect-escape reduction
Measured across all live Corelogic factories
2w
Time to go live
From signed agreement to production monitoring
฿0
CAPEX required
Subscription model, no hardware to buy

Pricing tailored to your factory.

Subscription priced by number of production lines. No CAPEX, no long-term lock-in. Same-day quote.

// FAQ

Common questions.

What PLC brands does Corelogic support?

Mitsubishi, Siemens, Omron, and any Modbus TCP device. Most EEC zone factories run at least one of these. We've never encountered a factory we couldn't integrate — and we never required replacing existing hardware.

How long does deployment actually take?

14 calendar days from signed agreement. Days 1–3: on-site survey and PLC mapping. Days 4–7: rule configuration, dashboard setup, and user accounts. Days 8–13: operator and supervisor training. Day 14: go-live with our team monitoring remotely for the first 48 hours.

Do we need our own IT infrastructure?

No. Corelogic is fully managed SaaS. We provide and maintain all servers and infrastructure. Your team only needs a browser. Updates happen automatically, with no downtime.

What happens if internet connectivity goes down?

Auto-stop triggers at the PLC level — it does not depend on internet connectivity. If the cloud connection drops, the local stop logic continues operating. All events buffer locally and sync once connection is restored.

// Contact

Interested in a demo?

Our team covers the EEC zone — Chon Buri and Rayong. We'll get back to you within one business day.

No commitment. 30-day free trial available.